raipur construction tender
raipur, chhattisgarh
- construction of permanent campus of indian institute of technology bhilai at kutelabhata, durg, chhattisgarh. phase-b-part-1. sh- engineering department (3 blocks) (g plus 5), administrative block (01 block) (g plus 3), lecture hall complex (01 block) (capacity 990) (g plus 1), maths liberal arts (01 block) (g plus 3), teaching labs (01 block) (g plus 2), access corridor (g plus 1) ancillary buildings (watch towers security cabins, data center plant room) including internal water supply, sanitar
- Authority : Central Public Works Department
- Deadline : 27 Oct 2026
- Value : 355.96 Crores
- Download
raipur, chhattisgarh
- construction of lhs in lieu of l.c. no. 284 rob in lieu of l.c. no. 283 on bilaspur - jharsuguda sections under s.e.c. railway, bilaspur division balance works 4 th call
- Authority : National Projects Construction Corporation Limited
- Deadline : 13 Oct 2026
- Value : 27.87 Crores
- Download
raipur, chhattisgarh
- supply of construction type- 1
- Authority : Directorate Of School Education
- Deadline : 21 Oct 2026
- Value : Refer Document
- Download
raipur, chhattisgarh
- supply of construction type- 2
- Authority : Directorate Of School Education
- Deadline : 21 Oct 2026
- Value : Refer Document
- Download
raipur, chhattisgarh
- supply and installation of multi-tier racking systems along with material handling equipment for the newly constructed permanent store kudgi
- Authority : National Thermal Power Corporation Limited
- Deadline : 14 Oct 2026
- Value : Refer Document
- Download
raipur, chhattisgarh
- design, engineering, supply, construction, erection and installation ofdust curtain along boundary wall in stage-i and ii chp area
- Authority : National Thermal Power Corporation Limited
- Deadline : 14 Oct 2026
- Value : Refer Document
- Download
raipur, chhattisgarh
- execution of signaling telecommunication work in connection with: (1) construction of new 10 rooms (20 bedded) running room at bhatapara in raipur division, (2) construction of new 15 rooms (30 bedded) running room at dallirajhara in raipur division
- Authority : South East Central Railway
- Deadline : 16 Oct 2026
- Value : Refer Document
- Download
