guntakal construction tender
guntakal, andhra pradesh
- construction of toilet and bath rooms block 2 in the premises of temple
- Authority : Endowments Department
- Deadline : 14 May 2026
- Value : 7.99 Lac
- Download
guntakal, andhra pradesh
- constructoin of toilet and bath rooms block 3 in the premises of temple
- Authority : Endowments Department
- Deadline : 14 May 2026
- Value : 7.99 Lac
- Download
guntakal, andhra pradesh
- secunderabad division electrical maintenance department - (i) bhongir- construction of 8 bedded rpf barracks for male at bhongiri -out post (ii) dls/kzj - upgradation of rpf out post building at dls/kzj (iii) jamikunta - construction of cpwi office and sh
- Authority : South Central Railway
- Deadline : 29 May 2026
- Value : Refer Document
- Download
guntakal, andhra pradesh
- name of work :-bza division - bza - vskp section - proposed construction of two storey station building in sse/works/tuni section under aden/tuni sub-division (umbrella work of pink book 2022-23 under planhead-3300).
- Authority : South Central Railway
- Deadline : 29 May 2026
- Value : Refer Document
- Download
guntakal, andhra pradesh
- steel wire rope sling, rope dia: 10 mm x 5 mtr length with mechanically ferrule spliced to is- 5245 part ii 1971 at both ends with double crimping, usha martin make or similar steel wire rope 6/19f construction, un galvanized, 1770 n/mm sq tensile strengt
- Authority : South Central Railway
- Deadline : 11 May 2026
- Value : Refer Document
- Download
guntakal, andhra pradesh
- sw-i: bza division: gdv-bvrm section: proposed construction of bridge no. 4 near lc no. 52 between gdv otr stations under aden/bvrm jurisdiction. sw-ii: bza division: gdv-mtm section: dismantling of existing gate lodge lc no. 3 between gdv nuj
- Authority : South Central Railway
- Deadline : 29 May 2026
- Value : Refer Document
- Download
guntakal, andhra pradesh
- guntakal division: gooty -wadi section: proposal for construction of rub of size 2x 6.0 mx 5.0 m rcc box in lieu of lc-234 at km 667/7-8 between wadi and nalwar stations by air-pushing with rh-girder and rcc retaining wall.
- Authority : South Central Railway
- Deadline : 26 May 2026
- Value : Refer Document
- Download
guntakal, andhra pradesh
- electrical construction/bza - guntur division - electrical arrangements for newly constructed rob in lieu of lc no.249 in guntur town limits at railway km 22/10-11 of guntur-tenali section and at km 1/6 of guntur-hanumanpalem road and shifting/modification
- Authority : South Central Railway
- Deadline : 22 May 2026
- Value : Refer Document
- Download
guntakal, andhra pradesh
- sw-i. jmkt: construction of cpwi office and shed at jmkt. sw-ii.sc div: construction of office cum stores building for sse/sig at skzr over sc division.
- Authority : South Central Railway
- Deadline : 22 May 2026
- Value : Refer Document
- Download
guntakal, andhra pradesh
- sc-kzj section: construction of office cum stores building for sr.section engineer (signal) at bhongir.
- Authority : South Central Railway
- Deadline : 22 May 2026
- Value : Refer Document
- Download
guntakal, andhra pradesh
- south central railway (construction organization)- secunderabad division - engineering, procurementand construction (epc) contract for the construction of "important bridges (2 nos), i.e., (a) d/s bridges (15 x 20 m) including substructure and supers
- Authority : South Central Railway
- Deadline : 03 Jul 2026
- Value : Refer Document
- Download
guntakal, andhra pradesh
- proposed elimination of level crossing gates lc no.106, 117, 126, 146 & 261 by constructing road under bridges (rubs) in the section between bza-gdr under pkg-2 of bza 3rd line project in vijayawada division, south central railway, andhra pradesh, ind
- Authority : South Central Railway
- Deadline : 20 May 2026
- Value : Refer Document
- Download
guntakal, andhra pradesh
- sw-i : construction of tower car shed for bza depot in bza division. sw-ii : bza- proposed construction of office & store building for sse/w/watering arrangements/bza in sse/works/bza section. sw-iii: bza division : ryp station -construction of general wa
- Authority : South Central Railway
- Deadline : 22 May 2026
- Value : Refer Document
- Download
guntakal, andhra pradesh
- guntakal division - proposed construction of 3 m wide fob in chinnekuntapalle station in den/west/gtl jurisdiction.
- Authority : South Central Railway
- Deadline : 22 May 2026
- Value : Refer Document
- Download
guntakal, andhra pradesh
- guntakal division - proposed construction of 3 m wide fob in tumanagunta station in den/west/gtl jurisdiction.
- Authority : South Central Railway
- Deadline : 22 May 2026
- Value : Refer Document
- Download
guntakal, andhra pradesh
- guntakal division - proposed construction of 03 m wide fob in settigunta, hastavaram, mantapampalle stations in sr.den/south/gtl jurisdiction.
- Authority : South Central Railway
- Deadline : 22 May 2026
- Value : Refer Document
- Download
guntakal, andhra pradesh
- hyb: sc-mue: construction of rub at km 601/15-17 (ohe) (trespassing location) at gundlapochampalli yard.
- Authority : South Central Railway
- Deadline : 22 May 2026
- Value : Refer Document
- Download
guntakal, andhra pradesh
- guntakal division:-updation, certification and construction etc, . of land plans between kpd-tpty-ru & dmm-pak section under den /west/gtl jurisdiction
- Authority : South Central Railway
- Deadline : 22 May 2026
- Value : Refer Document
- Download
guntakal, andhra pradesh
- guntakal division - proposed construction of 3 m wide fob in tanakallu station in den/west/gtl jurisdiction.
- Authority : South Central Railway
- Deadline : 22 May 2026
- Value : Refer Document
- Download
guntakal, andhra pradesh
- guntakal division - proposed construction of 3 m wide fob in kurabalakota station in den/west/gtl jurisdiction.
- Authority : South Central Railway
- Deadline : 22 May 2026
- Value : Refer Document
- Download
