bareilly construction tender
bareilly, uttar pradesh
- survey, investigation and designing (hydrographic, hydraulic, structural etc.) of construction of rcc strom water drain from trishoolchauraha to nakatiya river on pilibhit bypass road, bareilly.including supply of all material,labour, tandp etc.
- Authority : Uttar Pradesh Jal Nigam
- Deadline : 28 May 2026
- Value : 22.03 Crores
- Download
bareilly, uttar pradesh
- selection of agency for design, engineering, procurement, and construction (epc) of 2 bhk and 3 bhk residential apartments for nagar nigam staff at rampur garden, bareilly.
- Authority : Directorate Of Local Bodies
- Deadline : 07 May 2026
- Value : 14.84 Crores
- Download
bareilly, uttar pradesh
- construction work of winding road and rcc drain and side patri from moorti nursing home to raju press and sushil agarwal to jay man kali treders and jitendra to agarwal in jatav pura ward 02.
- Authority : Directorate Of Local Bodies
- Deadline : 07 May 2026
- Value : 1.57 Crore
- Download
bareilly, uttar pradesh
- construction work of box culvert kataiya nawada near pangahli river purak nale 5x 5x 5 mtr span box culvert approach road and surakshatam work
- Authority : Public Works Department
- Deadline : 07 May 2026
- Value : 1.42 Crore
- Download
bareilly, uttar pradesh
- in ward-15 hajiapur, construction work of drain and cc road from sakalani sweets via nandrams mill to golu kapde walas house and in the link streets.
- Authority : Directorate Of Local Bodies
- Deadline : 07 May 2026
- Value : 1.02 Crore
- Download
bareilly, uttar pradesh
- ward 37, construction of cc tile footpath and hotmix road from the culvert near nadosi khadauwa pond to hyderabad road.
- Authority : Directorate Of Local Bodies
- Deadline : 07 May 2026
- Value : 96.16 Lac
- Download
bareilly, uttar pradesh
- construction work of cc road and drain from devesh sharma office to rajendra parsad sharma and tiwari sadan in akanksha colony ward 10.
- Authority : Directorate Of Local Bodies
- Deadline : 07 May 2026
- Value : 77.41 Lac
- Download
bareilly, uttar pradesh
- construction of the road from khitousa gautiya to kaithola. development block fatehganj west
- Authority : Rural Engineering Department
- Deadline : 20 May 2026
- Value : 70.86 Lac
- Download
bareilly, uttar pradesh
- construction of boundary wall at kgbv, bhuta, bareilly (u.p)
- Authority : Uttar Pradesh Jal Nigam
- Deadline : 15 May 2026
- Value : 64.12 Lac
- Download
bareilly, uttar pradesh
- construction of the road from kurtara to satuiya khas, via the lakshmanjati temple. development block fatehganj west
- Authority : Rural Engineering Department
- Deadline : 20 May 2026
- Value : 61.90 Lac
- Download
bareilly, uttar pradesh
- construction of an interlocking tile road from the bareilly-pilibhit route to chhatrapati shivaji chowk in mahanagar colony development block bithri chainpur.
- Authority : Rural Engineering Department
- Deadline : 20 May 2026
- Value : 58.48 Lac
- Download
bareilly, uttar pradesh
- in ward no. 07 patel vihar, via munna lala and dinesh`s houses, from naveen`s house to thakur`s house and from dheeraj`s house to bablu`s house and lala ram wali gali and s.k. timber water tank interlocking road construction work up to (kent area)
- Authority : Rural Engineering Department
- Deadline : 20 May 2026
- Value : 54.31 Lac
- Download
bareilly, uttar pradesh
- construction work of village babura bhadenkanja mannia gurudwara sikhsabha road on 2 cell 4x 4 mtr span box culvert approach road and surakshatam work
- Authority : Public Works Department
- Deadline : 07 May 2026
- Value : 54.00 Lac
- Download
bareilly, uttar pradesh
- construction of a government link road extending inward from plot no. 287 in gram panchayat rajpuri nawada. development block bithri chainpur
- Authority : Rural Engineering Department
- Deadline : 20 May 2026
- Value : 53.18 Lac
- Download
bareilly, uttar pradesh
- construction of boundary wall at kgbv, kyara, bareilly (u.p)
- Authority : Uttar Pradesh Jal Nigam
- Deadline : 15 May 2026
- Value : 53.01 Lac
- Download
bareilly, uttar pradesh
- construction of interlocking pavement and drainage system in village ballia, extending from the culvert near pappu kashyap house to pankaj jaiswal house. development block - a.j.
- Authority : Rural Engineering Department
- Deadline : 20 May 2026
- Value : 51.59 Lac
- Download
bareilly, uttar pradesh
- construction of boundary wall at kgbv, fatehganj, bareilly (u.p)
- Authority : Uttar Pradesh Jal Nigam
- Deadline : 15 May 2026
- Value : 50.46 Lac
- Download
bareilly, uttar pradesh
- construction of an interlocking-tile road from pilibhit road, via silver straight, up to the mahanagar river development block urban area
- Authority : Rural Engineering Department
- Deadline : 20 May 2026
- Value : 49.83 Lac
- Download
bareilly, uttar pradesh
- ward no. 13, shanti vihar construction of interlocking roads and drains extending from fauji ki taal to ashoks shop, continuing from ashoks shop via bishts house up to kailash yadavs lane, and covering the connecting link lanes. development block ca
- Authority : Rural Engineering Department
- Deadline : 20 May 2026
- Value : 49.69 Lac
- Download
bareilly, uttar pradesh
- construction of the road from shri hiralals residence to shri ramprataps meeting hall in gram panchayat khanpura development block bhuta
- Authority : Rural Engineering Department
- Deadline : 20 May 2026
- Value : 46.03 Lac
- Download
