izzatnagar construction tender
izzatnagar, uttar pradesh
- construction of 50 bedded (25 nos of rooms) new running room at barsuan (bxf)
- Authority : South Eastern Railway
- Deadline : 11 Dec 2026
- Value : Refer Document
- Download
izzatnagar, uttar pradesh
- e execution of the work of (i) construction of 03 nos. of stabling lines beside the goods shed of dhalbhumgarh yard of kgp division (ii) construction of 4 nos. of stabling line at sgty (abb) station yard.
- Authority : South Eastern Railway
- Deadline : 07 Dec 2026
- Value : Refer Document
- Download
izzatnagar, uttar pradesh
- execution of (i) provision of compound wall & boundary wall (8 km) under the jurisdiction of aden/settlement/kgp, (ii) construction of 10 units new type-iii staff quarters at different colonies in kharagpur settlement under sr.den(hq)/kgp, (iii) construct
- Authority : South Eastern Railway
- Deadline : 07 Dec 2026
- Value : Refer Document
- Download
izzatnagar, uttar pradesh
- lithium -ion rechargeable battery operated 30-watt cob type led multipurpose locomotives work light having impact resistance construction, corrosion resistance aluminium die cast housing with shock and vibration proof rubberised edge, powder coated finish
- Authority : South Eastern Railway
- Deadline : 27 Nov 2026
- Value : Refer Document
- Download
izzatnagar, uttar pradesh
- supply of sonua (swr) - construction of a loop line to 3rd line and one sick siding of 70 m length and proper pathway in station yards
- Authority : South Eastern Railway
- Deadline : 18 Nov 2026
- Value : Refer Document
- Download
izzatnagar, uttar pradesh
- construction of road over bridge (rob): i)rob in lieu of lc no.24 at km. 149/29-31 between bhakrabad - belda in kgp-bhc section in kgp division, ii)rob in lieu of lc no.119 at km. 207/1-3 between dalbhumgarh - ghatsila in kgp-tata section in kgp division
- Authority : South Eastern Railway
- Deadline : 01 Dec 2026
- Value : Refer Document
- Download
izzatnagar, uttar pradesh
- electrical work for (i)construction of normal height subway in lieu of manned level crossings no. ka-159 at km 315/15-17 in between mdkd-dma in asn-cni sec in adra division (ii) construction of rub in lieu of manned level crossings jc-12 at km
- Authority : South Eastern Railway
- Deadline : 30 Nov 2026
- Value : Refer Document
- Download
izzatnagar, uttar pradesh
- st work in connection with construction of limited height subway (i) for elimination of 4 nos. of non-interlocked manned level crossing gate (lc no. ka-143, dk-1, dr-4 dr-5) between ada-asn section of adra division.(ii) construction of limited
- Authority : South Eastern Railway
- Deadline : 30 Nov 2026
- Value : Refer Document
- Download
izzatnagar, uttar pradesh
- construction of passenger platform in dn grid to eliminate up main cum dn loop facility.
- Authority : South Eastern Railway
- Deadline : 02 Dec 2026
- Value : Refer Document
- Download
izzatnagar, uttar pradesh
- electrical (g) works in connection with the construction of officers rest house at dangoaposi.
- Authority : South Eastern Railway
- Deadline : 02 Dec 2026
- Value : Refer Document
- Download
izzatnagar, uttar pradesh
- diversion and shifting of telecom cables for construction of new ssp at adityapur station.
- Authority : South Eastern Railway
- Deadline : 30 Nov 2026
- Value : Refer Document
- Download
izzatnagar, uttar pradesh
- balance work for (i) chakradharpur division - 35197 meter of cess repair work between tata-ond and ond-bmpr under the jurisdiction of sr.den(east)ckp. (ii) cutting of cess, repairing of cess and construction of side drain between section tata - asb under
- Authority : South Eastern Railway
- Deadline : 27 Nov 2026
- Value : Refer Document
- Download
izzatnagar, uttar pradesh
- s&t work in connection with construction of long loop line at up side and one sick siding of 70 m length at dharuadih.
- Authority : South Eastern Railway
- Deadline : 30 Nov 2026
- Value : Refer Document
- Download
izzatnagar, uttar pradesh
- s&t work in connection with construction of trt siding at bamra.
- Authority : South Eastern Railway
- Deadline : 30 Nov 2026
- Value : Refer Document
- Download
izzatnagar, uttar pradesh
- construction of 12 units type ii quarters in replacement of condemned quarters. [maluka (mlka) 6 units & kendposi (knps) 6 units].
- Authority : South Eastern Railway
- Deadline : 26 Nov 2026
- Value : Refer Document
- Download
izzatnagar, uttar pradesh
- yard remodeling of illoo yard, construction of platform, p.f. shelter, passenger ammenities work and foot over bridge in connection with chandil(gdbr) muri doubling project & construction of platform, p.f. shelter, passenger ammenities and extension
- Authority : South Eastern Railway
- Deadline : 26 Nov 2026
- Value : Refer Document
- Download
izzatnagar, uttar pradesh
- supply of steel wire rope flexible un-galvanised nominal dia. 18 mm, fibre core, right hand ordinary lay, 6x 37 m (18/12/6-1) construction. material and specification: is: 2266:2024 (rev. 6), rope grade 1960.
- Authority : South Eastern Railway
- Deadline : 25 Nov 2026
- Value : Refer Document
- Download
izzatnagar, uttar pradesh
- supply of steel wire rope flexible un galvanised nominal dia 20 mm, fibre core, right hand, ordinary lay, 6 x 37 m (18/12/6-1) construction. material and specification : is: 2266:2024 (rev. 6), rope grade 1960.
- Authority : South Eastern Railway
- Deadline : 19 Nov 2026
- Value : Refer Document
- Download
izzatnagar, uttar pradesh
- supply of steel wire rope flexible un- galvanised, nominal dia. 16 mm, fibre core, right hand ordinary lay, 6 x 37 m (18/12/6-1) construction. material and specification : is: 2266:2024 (rev. 6), rope grade 1960.
- Authority : South Eastern Railway
- Deadline : 17 Nov 2026
- Value : Refer Document
- Download
izzatnagar, uttar pradesh
- s&t work in connection with construction of a loop line for 3rd line and one sick siding of length 70 m. at talaburu.
- Authority : South Eastern Railway
- Deadline : 30 Nov 2026
- Value : Refer Document
- Download
