howrah construction tender
howrah, west bengal
- construction of new 33 kv ug line by micro tunneling and laying of 200 mm dia pe 80 pn 6 hdpe pipe and laying of 33 kv 3 c 400 sq mm xlpe cable at new ht bulk connection iro lumino industries limited at jalan complex jangalpur under howrah ii division
- Authority : West Bengal State Electricity Distribution Company Limited
- Deadline : 29 May 2026
- Value : 19.63 Lac
- Download
howrah, west bengal
- i) electrical work in c/w construction of additional rooms at running room malda. ii) electrical work in c/w construction of new crew lobby building and renovation/augmentation of existing running room of mldt.
- Authority : Eastern Railway
- Deadline : 01 Jun 2026
- Value : Refer Document
- Download
howrah, west bengal
- (i) electrical work in c/w "construction 40 bedded rpf kote barrack along with 05 nos offices of different units, malkhana and central kote barrack at mldt." (ii) electrical work in c/w "upgradation and improvement of railway institute at mldt."
- Authority : Eastern Railway
- Deadline : 29 May 2026
- Value : Refer Document
- Download
howrah, west bengal
- electrical (general) work in connection with construction of new lhs in lieu of lc gate no. 6/3 by railway relieving girder under aen/ndae
- Authority : Eastern Railway
- Deadline : 29 May 2026
- Value : Refer Document
- Download
howrah, west bengal
- electrical (general) work in connection with construction of new lhs in lieu of lc gate no. 12 a/1 by railway relieving girder under aen/ndae
- Authority : Eastern Railway
- Deadline : 29 May 2026
- Value : Refer Document
- Download
howrah, west bengal
- electrical (general) work in connection with construction of new lhs in lieu of lc gate no. 24 a/4(e) by railway relieving girder under aen/az
- Authority : Eastern Railway
- Deadline : 29 May 2026
- Value : Refer Document
- Download
howrah, west bengal
- supply of 1)electrical (general) work in connection with construction of new lhs in lieu of lc gate no. 7/c by railway relieving girder under aen/ndae. 2)electrical (general) work in connection with construction of new lhs in lieu of lc gat
- Authority : Eastern Railway
- Deadline : 29 May 2026
- Value : Refer Document
- Download
howrah, west bengal
- i) electrical work in c/w construction of subway in lieu of lc gate no 8/spl at km 286/5-6 in bet stn gga-llm in sbg-bgp section of malda division. ii) electrical work in c/w construction of subway in lieu of lc gate no 2 a at km 314/9-31
- Authority : Eastern Railway
- Deadline : 28 May 2026
- Value : Refer Document
- Download
howrah, west bengal
- howrah division- signalling work in connection with- schedule a1-signalling cost for construction of new lhs in lieu of lc gate no. 30 by railway`s relieving girder under aen/bdc. schedule a2-telecommunication cost for construction of new lhs in lieu of l
- Authority : Eastern Railway
- Deadline : 29 May 2026
- Value : Refer Document
- Download
howrah, west bengal
- construction of common loop for left over work at sagardighi(sdi) station of hwh division.
- Authority : Eastern Railway
- Deadline : 29 May 2026
- Value : Refer Document
- Download
howrah, west bengal
- construction of new gate lodge in replacement of old gate lodge along with improvement of lc road surface in stn-jaj- main line mdp-grd, jsme- bdme.
- Authority : Eastern Railway
- Deadline : 29 May 2026
- Value : Refer Document
- Download
howrah, west bengal
- construction of gang huts for ws-1 at llh workshop and for ws-2 at besy and ladies dress changing room for ws-1 at llh workshop and for ws-2 at besy
- Authority : Eastern Railway
- Deadline : 27 May 2026
- Value : Refer Document
- Download
howrah, west bengal
- electrical (general) work in connection with "construction of gang huts at she, bbae, bhr, hgy, siu, bahw, tlph, tkph, tak, hpl, vsu, gnjp, maynapur mayapur, ambg, gogt station including ladies dress changing room at she, bhr and tak station under
- Authority : Eastern Railway
- Deadline : 22 May 2026
- Value : Refer Document
- Download
howrah, west bengal
- at kpaw- provision for construction of shed beside shop 6 for bogie shot blasting plant at loco complex.
- Authority : Eastern Railway
- Deadline : 22 May 2026
- Value : Refer Document
- Download
howrah, west bengal
- electrical (general) work in connection with "construction of new lhs in lieu of lc gate no. 8/1 by railway's relieving girder under aen/ndae".
- Authority : Eastern Railway
- Deadline : 26 May 2026
- Value : Refer Document
- Download
howrah, west bengal
- construction of 'new store depot at tkpr coaching yard'.
- Authority : Eastern Railway
- Deadline : 26 May 2026
- Value : Refer Document
- Download
howrah, west bengal
- removal of existing infringement , construction of aftc hut, l.c gate lodge, pwi office cum store and other ancillary works in connection with chandanpur- shaktigarh 4 th railway line project.
- Authority : Eastern Railway
- Deadline : 18 May 2026
- Value : Refer Document
- Download
howrah, west bengal
- electrical (general) work in connection with construction of gang huts near station tkp, lap, gsgb, kgle, kzpe and bzle under section of aden/az
- Authority : Eastern Railway
- Deadline : 15 May 2026
- Value : Refer Document
- Download
howrah, west bengal
- electrical (general) work in connection with & construction of gang huts at shbc, crae, grae jpq in the section of sse/w/dkae under aen/dkae
- Authority : Eastern Railway
- Deadline : 15 May 2026
- Value : Refer Document
- Download
howrah, west bengal
- design, manufacture and supply of machine room / machine room less (mrl) passenger lift ( g + 4 ), 5 stops, 5 openings, 8 passenger capacity ( 544 kgs ) in connection with the work for "electrical general work in connection with "construction of zonal net
- Authority : Eastern Railway
- Deadline : 13 May 2026
- Value : Refer Document
- Download
