guntakal construction tender
guntakal, andhra pradesh
- expansion of m&e stores, development of rsp stores (old dy. cmm office and existing wards), construction of cleaning facilities for bogie and other components, construction of peb shed for memu maintenance, upgradation & development of infrastructure faci
- Authority : South Central Railway
- Deadline : 03 Nov 2026
- Value : Refer Document
- Download
guntakal, andhra pradesh
- sw-i-construction of new side drains by replacing damaged unserviceable drains- under aden/awb`s jurisdiction(total qty=3200 rm) ).(irpsm id11.04.31.25.4.53.006)sw-ii-construction of new side drains by replacing damaged unserviceable drains- under aden/j`
- Authority : South Central Railway
- Deadline : 29 Oct 2026
- Value : Refer Document
- Download
guntakal, andhra pradesh
- south central railway - construction organisation : secunderabad divison : secunderabad - wadi section : #sw 1: execution of earth work in embankment cutting, blanketing to rdso standards, construction of minor bridges road under bridges (rubs)
- Authority : South Central Railway
- Deadline : 04 Nov 2026
- Value : Refer Document
- Download
guntakal, andhra pradesh
- steel wire rope, dia-16 mm, construction 6x 36, main core steel, un-galvanized, rhol, tensile strength 1960 n/mm 2, as per is:2266:2002
- Authority : South Coast Railway
- Deadline : 29 Oct 2026
- Value : Refer Document
- Download
guntakal, andhra pradesh
- guntakal division-guntakal: provision of electrical arrangements for augmentation of existing running room by constructing additional floor on existing running room annex-ii building.
- Authority : South Coast Railway
- Deadline : 22 Oct 2026
- Value : Refer Document
- Download
guntakal, andhra pradesh
- dharmavaram - provision of electrical arrangements for construction of new crew lobby with all facilities
- Authority : South Coast Railway
- Deadline : 21 Oct 2026
- Value : Refer Document
- Download
guntakal, andhra pradesh
- tirupati: proposed construction of new sub-ordinate rest house with 20 bedded capacity
- Authority : South Coast Railway
- Deadline : 16 Oct 2026
- Value : Refer Document
- Download
guntakal, andhra pradesh
- kalluru-proposed construction of staff quarters type-iv (1 unit) and type-iii (1 unit) for sse je/p.way/klu
- Authority : South Coast Railway
- Deadline : 16 Oct 2026
- Value : Refer Document
- Download
guntakal, andhra pradesh
- sc-wd section: sw 1) lingampally: construction of new running room at lpi with 40 beds. sw 2) lingampalli: new tte rest house with 30 beds (24-m, 06-f ttes with separate toilets), acs, kitchen, store, r.o water and further provision. sw 3) lingampalli: provision cc pathway 200x1.5m from c & w office to station platform, provision of 4x3 m room for r&d staff on pf 4 & 5 under fob and provision of rolling in huts & lights on pf3 side sc end.
- Authority : South Central Railway
- Deadline : 16 Oct 2026
- Value : Refer Document
- Download
guntakal, andhra pradesh
- guntakal - proposed construction of dttc-hostel building of 130 bedded capacity for trainees on age-cum-condition basis
- Authority : South Coast Railway
- Deadline : 19 Oct 2026
- Value : Refer Document
- Download
guntakal, andhra pradesh
- hyderabad division: 1) proposed construction of road over bridge (4 lanes on bridge proper and 2 lanes on each arm (3 arms) and lhs in lieu of lc no.27 at km. 58460.00 m proposed span as 1x43.760 m clear span composite girder and lhs at km.58357.900 m of size 1x5.00x2.50m (min. clear height) rcc box (box pushing & cast-in-situ) between timmapur and shadnagar stations - electrical arrangements 2) sc-dhne section: proposed construction of rob in lieu of existing lc no.90a between wpr and srnr stat
- Authority : South Central Railway
- Deadline : 16 Oct 2026
- Value : Refer Document
- Download
guntakal, andhra pradesh
- construction of new running room at prpi with 30 beds.
- Authority : South Central Railway
- Deadline : 16 Oct 2026
- Value : Refer Document
- Download
guntakal, andhra pradesh
- sw-i - manchiryal-provision of additional facilities at manchiryal goods shed. sw-ii - manchiryal - development of manchiryal parcel office. sw-iii - sig. arrangement in connection with interlocking of three (3) number of lc gates (lc. no. 42, 24 & 15) of nzb - pdpl section (construction of relay hut for lc 15 & 24).
- Authority : South Central Railway
- Deadline : 16 Oct 2026
- Value : Refer Document
- Download
guntakal, andhra pradesh
- sc division: proposed construction of limited height subway as precast rcc box of size 1x 2.6x 2.60 m by air pushing method using 20.4 m rh girder at 1. km 147/27-29 and 2. km 148/10-12 between magh-whirgoan stations for wildlife crossing under sr. den/north
- Authority : South Central Railway
- Deadline : 16 Oct 2026
- Value : Refer Document
- Download
guntakal, andhra pradesh
- nanded division: proposed construction of balance re works for handing over except track portion (i.e.trip shed and office building at nanded station) electrical arrangements
- Authority : South Central Railway
- Deadline : 15 Oct 2026
- Value : Refer Document
- Download
guntakal, andhra pradesh
- hyderabad division: 1) construction of rpf out post building with lock up room, toilets, etc. and 06 bed rpf barrack with furniture at gadwal- electrical arrangements 2) construction of 10 bed female rpf barrack with kitchen including furniture at kurnool
- Authority : South Central Railway
- Deadline : 16 Oct 2026
- Value : Refer Document
- Download
guntakal, andhra pradesh
- guntakal division - sw-(i) :renigunta - upgradation of running room building by providing all specified facilities with 75 bed capacity (a/c). sw-(ii): renigunta: :construction of crew lobby office with all facilities.
- Authority : South Coast Railway
- Deadline : 12 Oct 2026
- Value : Refer Document
- Download
guntakal, andhra pradesh
- guntakal division - sw-(i) :nandaluru: construction of new running room (50 beds) with all facilities. sw-(ii):nandaluru: :construction of crew lobby office with all facilities.sw-(iii): construction of rpf outpost building at rajampeta.
- Authority : South Coast Railway
- Deadline : 12 Oct 2026
- Value : Refer Document
- Download
guntakal, andhra pradesh
- guntakal division - sw-(i) :kadapa: proposed construction of type iv quarters 02 units (01 unit each for aden/hx, sse/pway/hx ). sw-(ii):anantarajupet and pullampet : proposed construction of type-ii quarters 8 units for trackmen (4 units at each station)
- Authority : South Coast Railway
- Deadline : 12 Oct 2026
- Value : Refer Document
- Download
guntakal, andhra pradesh
- scr construction organization- nanded division- proposed yard arrangements at dinegaon yard from km. 167.500 to 170.200 (2.70 kms) and jalna yard at km. 174.975 to 177.450 (2.475 kms) (total:5.175 kms) in connection with proposed doubling of track from chhat
- Authority : South Central Railway
- Deadline : 13 Oct 2026
- Value : Refer Document
- Download
