guntakal construction tender
guntakal, andhra pradesh
- general electrical works for provision of high mast lighting and street lighting to newly constructed approach road connecting rob service road on west side to goods platform at tenali station in krv-kcc section under pkg-3 of bza 3rd line project in vija
- Authority : South Central Railway
- Deadline : 31 Aug 2026
- Value : Refer Document
- Download
guntakal, andhra pradesh
- construction of additional cops in stations under aden/dkj section.sw ii.construction of shed for sr. section engineer (signal) office at dornakal.
- Authority : South Central Railway
- Deadline : 16 Sep 2026
- Value : Refer Document
- Download
guntakal, andhra pradesh
- hyderabad division: 1) construction of running room 20 beds capacity at mly - electrical arrangements 2) general electrical arrangements for relay hut to accommodate signaling interlocking equipment of automatic block signaling (abs) model works in iriset
- Authority : South Central Railway
- Deadline : 10 Sep 2026
- Value : Refer Document
- Download
guntakal, andhra pradesh
- nanded division: sw-i:- cess repairs/widening work under sse/p.way ned jurisdiction(4.20 km). sw-ii:- cess repairs/widening work under sse/p.way/mue jurisdiction ( 6.30 km ). sw-iii construction of new side drains by replacing damaged unserviceable drains
- Authority : South Central Railway
- Deadline : 08 Sep 2026
- Value : Refer Document
- Download
guntakal, andhra pradesh
- s t works in connection with provision of left over works at rub constructed in lieu of lc 86 at km 195/9-10 between kodi-rne stations in mue-mmr section
- Authority : South Central Railway
- Deadline : 01 Sep 2026
- Value : Refer Document
- Download
guntakal, andhra pradesh
- scr construction organisation - sc division: wadi - secunderabad section - proposed 3rd 4 th lines between wadi - sanathnagar stations (a) construction of ballast siding centralised ballast depot at dharur station duly carrying out earthwork in embankment
- Authority : South Central Railway
- Deadline : 02 Sep 2026
- Value : Refer Document
- Download
guntakal, andhra pradesh
- secunderabad division electrical maintenance department - construction of new crossing station at 8-9 km between ramagundam and gdk line on deposit terms-electrical arrangements.
- Authority : South Central Railway
- Deadline : 01 Sep 2026
- Value : Refer Document
- Download
guntakal, andhra pradesh
- scr construction organisation - secunderabad division : wadi-secunderabad section - proposed construction of new road over bridge (rob) no.35-a at km: 36/6-8 with rdso standard span composite girders (railway portion) for 2-lane road traffic on open found
- Authority : South Central Railway
- Deadline : 01 Sep 2026
- Value : Refer Document
- Download
guntakal, andhra pradesh
- secunderabad division electrical maintenance department (i) replacement of 8 nos type-ii quarters and 2 nos. type-iii quarters at asaf (ii) makudi - construction of type ii quarters -6 nos. at makudi station under aden/bpa sub-division in sr.den/north jur
- Authority : South Central Railway
- Deadline : 31 Aug 2026
- Value : Refer Document
- Download
guntakal, andhra pradesh
- hyderabad division: construction of boundary wall at 7th battalion / rpsf/mly.
- Authority : South Central Railway
- Deadline : 28 Aug 2026
- Value : Refer Document
- Download
guntakal, andhra pradesh
- hyb div: proposed construction of new rpsf sos barrack with 50 bed capacity (g+1) at 7/bn/mly
- Authority : South Central Railway
- Deadline : 28 Aug 2026
- Value : Refer Document
- Download
guntakal, andhra pradesh
- south central railway - construction organisation - nanded division - akola-khandwa section: conversion of track from metre gauge (mg) to broad gauge (bg) construction of second high-level platforms, foot over bridges, yard drains, cover over platforms, c
- Authority : South Central Railway
- Deadline : 09 Sep 2026
- Value : Refer Document
- Download
guntakal, andhra pradesh
- south central railway - construction organisation : secunderabad divison : secunderabad - wadi section : execution of earth work in embankment & cutting, blanketing to rdso standards, construction of major bridges, minor bridges & road under bridges (rubs
- Authority : South Central Railway
- Deadline : 08 Sep 2026
- Value : Refer Document
- Download
guntakal, andhra pradesh
- scr construction organization: hyderabad division-proposed doubling between mahbubnagar - dhone stations - (i) earthwork in formation including blanketing to irs ge:0004 specifications, (ii) construction of major/minor bridges & rubs, retaining wall, catc
- Authority : South Central Railway
- Deadline : 27 Aug 2026
- Value : Refer Document
- Download
guntakal, andhra pradesh
- construction of rub in lieu of lc no.149 at km 271/0-100 between ulindakonda - veldurti stations.
- Authority : South Central Railway
- Deadline : 24 Aug 2026
- Value : Refer Document
- Download
guntakal, andhra pradesh
- sw i.dkj-bdcr section : kra : proposed construction of type-iv quarter (1 no.) for sse/p.way and type-iii (1 no.) for je/pway at karepalli.sw ii.dornakal jn : sc division : kzj-bza section: construction of boundary wall to prevent encroachments at dkj yard
- Authority : South Central Railway
- Deadline : 25 Aug 2026
- Value : Refer Document
- Download
guntakal, andhra pradesh
- scr construction organization- nanded division- proposed laying of additional loop lines at kataroad, dhamini, kekatumar, barsitakli, navalgaon in akola - purna section and umram in mudkhed-adilabad section - execution of earth work in formation, construc
- Authority : South Central Railway
- Deadline : 27 Aug 2026
- Value : Refer Document
- Download
guntakal, andhra pradesh
- scr construction organization - proposed new bg line works between manoharabad and kothapalli stations - gjwl-lkdm section - proposed construction of new road over bridge no. 90/a with approaches on either side comprising 14 x 18.40 m rcc girder + 1 x 36.
- Authority : South Central Railway
- Deadline : 28 Aug 2026
- Value : Refer Document
- Download
guntakal, andhra pradesh
- appointment of project supervision services agency (pssa) at various construction sites / sections in the jurisdiction of gati shakti unit, secunderabad division, south central railway.
- Authority : South Central Railway
- Deadline : 25 Aug 2026
- Value : Refer Document
- Download
