ballia construction tender
ballia, uttar pradesh
- construction of a covered rcc drain, extending from the storeroom of the durga temple (located behind the railway station) to the small bridge near the temple gate.
- Authority : Directorate Of Local Bodies
- Deadline : 23 Oct 2026
- Value : 25.29 Lac
- Download
ballia, uttar pradesh
- construction of a cc (cement concrete) road in ward no. 01, starting from lallan tiwari?çös house in rajendra nagar, passing by tapeshwar gupta?çös house, and extending up to santosh singh?çös *hata* (premises/compound).
- Authority : Directorate Of Local Bodies
- Deadline : 23 Oct 2026
- Value : 16.83 Lac
- Download
ballia, uttar pradesh
- construction of a cc road and a drain in ward no. 06, from sintu house to deepu house.
- Authority : Directorate Of Local Bodies
- Deadline : 12 Nov 2026
- Value : 15.96 Lac
- Download
ballia, uttar pradesh
- construction of an anganwadi centre on the premises of the composite school, siyar, in ward no. 10.
- Authority : Directorate Of Local Bodies
- Deadline : 12 Nov 2026
- Value : 14.24 Lac
- Download
ballia, uttar pradesh
- construction of an additional classroom at the composite school, siyar, in ward no. 10.
- Authority : Directorate Of Local Bodies
- Deadline : 12 Nov 2026
- Value : 9.55 Lac
- Download
ballia, uttar pradesh
- construction of an additional room on the first floor of primary school, seear no. 01.
- Authority : Directorate Of Local Bodies
- Deadline : 12 Nov 2026
- Value : 8.24 Lac
- Download
ballia, uttar pradesh
- construction of an interlocking `zig-zag` road from the main road to munna verma school in hata mohalla, ward no. 02.
- Authority : Directorate Of Local Bodies
- Deadline : 23 Oct 2026
- Value : 7.18 Lac
- Download
ballia, uttar pradesh
- construction of a coloured interlocking-tile sanjay house to ganesh house in ward no. 12.
- Authority : Directorate Of Local Bodies
- Deadline : 12 Nov 2026
- Value : 6.25 Lac
- Download
ballia, uttar pradesh
- construction of a covered drain and installation of l-shaped, colored, interlocking zigzag paver blocks, starting from the residence of the late vijay gond in ward no. 12, azad nagar passing by the homes of lala chauhan and santosh singh and extending up
- Authority : Directorate Of Local Bodies
- Deadline : 23 Oct 2026
- Value : 5.57 Lac
- Download
ballia, uttar pradesh
- construction of l-shaped drains (both open and covered) and the installation of colorful, interlocking, zigzag paver blocks in ambedkar nagar (ward no. 03) specifically, from the house of the late veerbahadur to the house of akshaylal rajbhar, and from th
- Authority : Directorate Of Local Bodies
- Deadline : 23 Oct 2026
- Value : 5.52 Lac
- Download
ballia, uttar pradesh
- construction of a covered drain and installation of colored, interlocking, zig-zag paver blocks, extending from the house of angad sahani in haata mohalla (ward no. 02), passing by the houses of deenanath and kallu, and reaching the house of jayprakash si
- Authority : Directorate Of Local Bodies
- Deadline : 23 Oct 2026
- Value : 4.07 Lac
- Download
ballia, uttar pradesh
- construction of a cc road from omprakash house to kapildev house in ward no. 08.
- Authority : Directorate Of Local Bodies
- Deadline : 12 Nov 2026
- Value : 3.26 Lac
- Download
ballia, uttar pradesh
- construction of a covered drain and installation of colorful, interlocking, zig-zag paver blocks, from the house of rakesh singh to the house of sunil srivastava in subhash nagar (ward no. 02).
- Authority : Directorate Of Local Bodies
- Deadline : 23 Oct 2026
- Value : 3.12 Lac
- Download
ballia, uttar pradesh
- construction work of junior engineers room in the premises of provincial division pwd ballia
- Authority : Public Works Department
- Deadline : 27 Oct 2026
- Value : Refer Document
- Download
ballia, uttar pradesh
- construction of covered rcc drain in ward no. 13, from sachindra verma house to rambabu shop.
- Authority : Directorate Of Local Bodies
- Deadline : 12 Nov 2026
- Value : Refer Document
- Download
ballia, uttar pradesh
- construction of a covered rcc drain in ward no. 06, from vinod shop to rajnarayan singh house.
- Authority : Directorate Of Local Bodies
- Deadline : 12 Nov 2026
- Value : Refer Document
- Download
ballia, uttar pradesh
- construction of covered rcc drain from the house of late kedar shah to gandhi ashram in ward 3/12.
- Authority : Directorate Of Local Bodies
- Deadline : 05 Nov 2026
- Value : Refer Document
- Download
ballia, uttar pradesh
- construction work of covered drain and cc road from vijayshankar rajbhar`s house to suryaballi rajbhar`s house in ward no. 02.
- Authority : Directorate Of Local Bodies
- Deadline : 26 Oct 2026
- Value : Refer Document
- Download
ballia, uttar pradesh
- construction of covered rcc drain and cc road from pawan`s house to panchami prajapati`s house in ward no. 02.
- Authority : Directorate Of Local Bodies
- Deadline : 26 Oct 2026
- Value : Refer Document
- Download
ballia, uttar pradesh
- construction work for beautification of community place in rajbhar basti in ward no. 04.
- Authority : Directorate Of Local Bodies
- Deadline : 26 Oct 2026
- Value : Refer Document
- Download
