proposed construction of pedestrian subway at, mysore (karnataka) , deadline is 10 aug 2026
| proposed construction of pedestrian subway at km 54/300-400 between makalidurga - thondebhavi, by air pushing method. size:1x5.00x2.65m (barrel length=33.00m). sw-ii: proposed construction of pedestrian subway at km 6/500-600 between penukonda - narayanap | |
| Deadline | 10 aug 2026 |
| Tenders Location | mysore - karnataka |
| Tenders Value | Refer Document |
| Document Cost | Refer Document |
| Tender categeory | construction, infrastructure, civil work |
| Our Ref. ID | 2607184197180 |
| Download Tender Document | |
