supply of construction sub base amp, badyar balla (jammu & kashmir) , deadline is 11 jun 2026
supply of construction sub base & base 168 sqm preparation of sub grade by excavating earth to an average of 22.5cm depth, dressing and consolidation with power road roller of 8-10 tonne capacity incl. making good the undulations etc. with earth or quarry spoils etc. and rerolling the subgrade incl. disposal of excavated soil upto 100 mtrs or as directed by engineer incharge at site disposed earth is to be levelled & neatly dressed with all leads, lifts and carriages complete